I’ve walked enough farms and half-built municipal trenches to know when a pipe system “just works.” Lately, the quiet workhorse has been the UPVC Drainage And Irrigation Pipe—not flashy, but dependable. From Hebei to the Gulf, installers keep telling me the same thing: stable pressure, clean joins, and fewer callbacks. Honestly, that’s what matters on a sweaty Tuesday afternoon.
Three converging trends: water scarcity, electrification of pumping (energy costs bite), and the shift to Ca–Zn stabilizer systems (lead-free). In practice, that means more uniform flows at lower pressure, simpler solvent-weld installs, and, surprisingly, fewer algae issues because the inner wall is smooth (k ≈ 0.007 mm).
| Nominal OD | SDR Options | Pressure Class (PN) | Typical Wall (mm) |
|---|---|---|---|
| Φ75 mm | SDR 26 / 21 / 17 | PN 0.6 / 1.0 / 1.6 MPa | ≈ 2.9 / 3.6 / 4.5 |
| Φ160 mm | SDR 26 / 21 / 17 | PN 0.6 / 1.0 / 1.6 MPa | ≈ 6.2 / 7.6 / 9.5 |
| Φ315 mm | SDR 26 / 21 / 17 | PN 0.6 / 1.0 / 1.6 MPa | ≈ 12.1 / 14.9 / 18.7 |
Range per spec: Φ75–Φ315 mm. Data indicative; real-world use may vary with temperature (best from 0–45°C) and burial depth.
- Agriculture (drip and sprinkler mains), orchards, greenhouses; - Municipal drainage and stormwater laterals; - Golf courses, sports turf; - Aquaculture and nursery flows. Many customers say solvent welding is faster than gasketed PE for small crews—less gear, fewer surprises.
Colors (gray/white/blue), lengths 4 m or 6 m, socket or plain-end, printed logos, perforated drain options, UV package tuning. I’ve seen projects ask for traceable batch codes—makes warranty talk simpler.
| Vendor | Certs | Lead Time | MOQ | OEM/Color | Price Index |
|---|---|---|---|---|---|
| Lida Plastic (Hebei, China) | ISO 9001/14001, RoHS | 10–20 days | ≈ 1×20' container | Yes / multiple | $$ |
| Regional Brand A | ISO 9001 | 15–30 days | Flexible | Limited | $$$ |
| Local OEM | Varies | 7–14 days | Low | Yes | $ |
My take: UPVC Drainage And Irrigation Pipe from Lida hits a sweet spot on lead time and QC documentation, especially for public bids.
Origin: No.316 Pingan West Street, Shunping County, Baoding City, Hebei, China 072250.
Cut square, deburr, dry-fit, apply primer/solvent cement, quarter-turn insert, hold 30–60 s. Allow cure as per cement data (longer if cold). Pressure test gradually—sounds basic, but rushing this step is where 90% of leaks happen, to be honest.